Overview

Australian states and territories are considering options to streamline network connection processes for large consumer energy resources (CER), including electric vehicle supply equipment (EVSE), and distribution level storage and renewables.

With increasing uptake of CER together with the transition to renewable energy sources and the electrification of transport, there is an increasing number of requests to connect these resources to local distribution networks. This growth has posed a significant challenge for the rapid installation of the infrastructure needed to support the transition to net zero at least cost.

We are now seeking your feedback on the options presented.

Have Your Say

To have your say:

  • read the options paper

  • provide a written submission using this consultation platform.

Submit your feedback by 11:59pm (AEST) 22 September 2024.

Timeline

  • Consultation opens
    closed

    26 August 2024

  • Consultation closes
    closed

    22 September 2024

Contact
Distributed Energy Policy