What is your name? - Name
What is your organisation? - Organisation
Which of the following best describes the current or intended operations of your business? - Which of the following best describes the current or intended operations of your business?
Which of the following best describes the current or intended operations of your business? - Other
NATURAL RESOURCES CONSULTANT
Where are your company’s headquarters located? - company location
Which sector best describes your organisation’s operations in Australia? - B Mining
Which sector best describes your organisation’s operations in Australia? - D Electricity, Gas, Water and Waste Services
Which sector best describes your organisation’s operations in Australia? - M Professional, Scientific and Technical Services
Is your organisation currently a liable entity under the National Greenhouse Energy & Reporting Scheme - Is your organisation currently a liable entity under the National Greenhouse Energy & Reporting Scheme
How much hydrogen do you estimate you will produce in 2021? - How much hydrogen do you estimate you will produce in 2021?
Beyond 2021 what do you anticipate will be your maximum annual production of hydrogen, and when will you reach that milestone? - maximum annual production of hydrogen
Beyond 2021 what do you anticipate will be your maximum annual production of hydrogen, and when will you reach that milestone? - Year you will reach that milestone
How much hydrogen do you estimate you will consume in 2021? - How much hydrogen do you estimate you will consume in 2021?
What do you anticipate will be your maximum annual consumption of hydrogen, and when will you reach that milestone? - maximum annual production of hydrogen
Which do you consider more important for your Australian operations? - Which do you consider more important for your Australian operations?
For the scheme you nominated above, what is the ideal date to have it in place by? - For the scheme you nominated above, what is the ideal date to have it in place by?
For the scheme you nominated above, what is the ideal date to have it in place by? - Why?
AUSTRALIA IS GOING TO NEED A LOT OF HYDRGEN FOR MEDIUM TERM RENEWABLES FIRMING IN PLACE TO SAVE ON NATURAL GAS.
THE TIMINIG RELATES TO THE GRADUAL WITHDRAWAL OF THE COAL FIRED FLEET FROM THE NEM COMMENCING IN 2022/23
If the ideal date was not achievable, what would be the latest date a certification scheme could be in place by without adversely affecting your Australian operations? - Select year, starting from 2021
If the ideal date was not achievable, what would be the latest date a certification scheme could be in place by without adversely affecting your Australian operations? - Why?
SECOND POWER STATION LEAVES NEM
HOW MUCH TIME DO YOU NEED THERE IS ALREADY A NEARLY ACDEPTABLE EEC SYSTEM
If both domestic and international schemes are important (Q7), should there be separate schemes or a single scheme? If there are separate schemes, what elements would be the most important to align and what linkages need to occur? - If both domestic and international schemes are important (Q7), should there be separate schemes or a single scheme? If there are separate schemes, what elements would be the most important to align and what linkages need to occur?
SINGLE SEAM NO LINKAGES REQUIRED
A certification scheme would measure and track the carbon emissions associated with hydrogen production. Are there any existing carbon accounting methodologies that a certification scheme should align with or adopt (e.g. the Australian National Greenhouse and Energy Reporting System?). - A certification scheme would measure and track the carbon emissions associated with hydrogen production. Are there any existing carbon accounting methodologies that a certification scheme should align with or adopt (e.g. the Australian National Greenhouse and Energy Reporting System?).
HYDROGEN CAN NCOME FOM A MULTIPLICITY OF SOURCES THE CSIRO MIS PLANNING TOM SIEVE IT OUT OF AMMONIA IF NTHAT TRASPIRES THEN PRESUMABLY WE WILL NEED TOMUNDERSTAND WHERE NTHE AMMONIA HAS BEEN SOURCED ETC ETC
Are there any other existing Australian regulatory frameworks that might interact with a certification scheme? - Are there any other existing Australian regulatory frameworks that might interact with a certification scheme?
NOT MY ARE OF EXPERTISE BUT WARY OF ATTEMPING TO [UT A TAG ON A MOLECULE OF ANY THING AND ESPECIALLY SO IF THE MOLECULES ARE THE SAME BUT HAVE DIFFERNT PARENTAGE
What are the three most important features a certification scheme should have? - 1
PROOF OF PROVIDENCE
What are the three most important features a certification scheme should have? - 2
RECOGNITION OF THE PERSON SIGNING LIKE THE JORC SYSTEM FOR MINERAL /COAL RESOURCES AND RESERVES
What are the three most important features a certification scheme should have? - 3
NOT ADD SIGNIFICANTLY TO UNIT COSTS
What are the three most important things a scheme should avoid? - 1
COMPLEXITY
What are the three most important things a scheme should avoid? - 2
ADDING TO COSTS
What are the three most important things a scheme should avoid? - 3
RELYING ON A SINGLE ARBITER THERE MUST BE MANY
Is there anything else you would like to bring to our attention? - Is there anything else you would like to bring to our attention?
HYDROGEN IS GOING TO BE COMMERCIALLY STORED A NUMBER OF WAYS
HYDROGEN STORAGE IS GOING TO BE POTENTIALLY COMPLEX
AND POSSIBLY INVOLVE ANY NUMBER OF HYDRIDES
HOW ARE YOU GOING TO ITS BEFORE STORAGE SOURCE PARTICULARLY IF COMMERCIALM STORAGE ACCEPTS IT FROM A NUMBER OF SOURCES WILL CERTIFICATION STOP IT BEING MIXED
Commercially sensitive information - If you wish your answers to be treated as commercial-in-confidence, please tick this box
Participating in the technical advisory group - If you would like to be considered for membership of the technical advisory group, please tick this box.
Which state government do you represent? - Location
Are there other applications not listed above that you consider to be important? - Please list them.
Not Answered
If a certification scheme was introduced, governments would need to consider how it interacts with existing domestic legislation and voluntary frameworks. For example, certifying renewable energy content for hydrogen production would require considering interactions with the Large Scale Renewable Energy Target. Other examples might include emissions reporting, energy market legislation, or building environmental certification schemes. - Which legislation or voluntary frameworks in your state might interact with a certification scheme?
Not Answered
Which do you consider more important for your state? - Which do you consider more important for your state?
For the scheme you nominated above, what is the ideal date to have it in place by? - Select year, starting from 2021
For the scheme you nominated above, what is the ideal date to have it in place by? - Why?
Not Answered
If the ideal date was not achievable, what would be the latest date a certification scheme should be in place by without adversely affecting potential projects or policies in your jurisdiction? - Why?
Not Answered
Unique ID